The Challenges of Designing and Installing High Pressure Gas Pipelines Through Inshore, Shallow Waters in Bahrain

机译:在巴林中,浅水区设计和安装高压气体管道的挑战

获取原文

摘要

In 1996 BAPCO embarked on a project to expand the Khuff Gas Transmission and Distribution networks in Bahrain. The project was divided into four discrete segments, namely, Transmission, Distribution, Offshore and Downstream. The paper and presentation will briefly describe the overall project and detail the challenges faced by BAPCO in the design and installation of the 3, 18” high pressure gas lines in the offshore segment. The offshore segment links Wharf Valve Station (WVS) at Sitra to Hidd Metering Station (HMS) located some 6 km away on the east side of Bahrain on Muharraq island. This offshore section is comprised of approximately 2 km crossing the main shipping channel that provides access to the port of Mina Salman. The remaining 4 kms traversed shallow waters that, at low tide, were above the water line in some areas. One section actually crossed an offshore island that is used by migrating terns. Challenges related to the protection of the environment during construction and subsequent operation will be detailed. Construction methods used and problems encountered, including steps taken to maintain access to Mina Salman port via the shipping channel, will be also be presented
机译:1996年,Bapco踏上了一个项目,扩大巴林的Khuff气体传输和分销网络。该项目分为四个离散的段,即传输,分销,海上和下游。本文和演示将简要描述整体项目,并详细介绍Bapco在近海段中的3,18英寸高压气体管线的设计和安装方面所面临的挑战。离岸领域的联系码头阀门站(WVS)在希特拉到Hidd计量站(HMS)距离酒店约6公里的巴林Muharraq岛上东侧。此海上部分由大约2公里的主要送货渠道组成,可提供对Mina Salman港口的访问。剩下的4公斤遍历浅水区,在一些地区的水线上高于水线。一个部分实际上越过了迁移燕鸥使用的近海岛屿。详细说明将详细介绍与施工过程中环境保护相关的挑战。使用施工方法和遇到的问题,包括通过运输渠道维护对Mina Salman端口的访问的步骤,将

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号