首页> 外文会议>International conference on structural repairs and maintenance heritage architecture >Earthquake behaviour of a reinforced concrete building constructed in 1933 before and after its repair
【24h】

Earthquake behaviour of a reinforced concrete building constructed in 1933 before and after its repair

机译:修复前后1933年钢筋混凝土建筑地震行为

获取原文
获取外文期刊封面目录资料

摘要

The earthquake behaviour of a four-storey reinforced concrete (R/C) building, which was constructed in 1933, is investigated here, before and after a recent maintenance and retrofitting. The numerically predicted earthquake behaviour of the initial structure, under the provisions of the current Greek Seismic Code, demonstrated the low resistance of this building to the design seismic loads. The estimate of the strength of existing structural members was based on specific tests performed in-situ as well as at the Laboratory of Strength of Materials and Structures, Aristotle University. The retrofitting scheme included the strengthening of vertical structural elements by jacketing, as well as the use of carbon fibre reinforced plastics (CFRP) for the improvement of the bearing capacity of the slabs. The numerically predicted earthquake behaviour of the retrofitted structure demonstrated the sufficient resistance of the retrofitted building.
机译:在近期维护和改造之前和之后,在1933年建造的四层钢筋混凝土(R / C)建筑的地震行为在此进行研究。在目前希腊地震代码的规定下,数值预测的初始结构的地震行为展示了这座建筑物的低阻力到设计地震载荷。现有结构成员强度的估计是基于原位进行的特定测试以及亚里士多德大学材料和结构强度实验室。改造方案包括通过夹套加强垂直结构元素,以及使用碳纤维增强塑料(CFRP)来改善板坯的承载力。改造结构的数值预测的地震行为示出了改造建筑物的足够电阻。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号