首页> 外文会议>International symposium on geological engineering problems in major construction projects >Laboratory study on underground water inflow (water leakage) path and related hydrodynamic parameters in tunneling
【24h】

Laboratory study on underground water inflow (water leakage) path and related hydrodynamic parameters in tunneling

机译:隧道地下水流入(漏水)路径(漏水)路径及相关流体动力学参数的实验室研究

获取原文

摘要

water inflow can often occur during tunnel construction, which affects the construction safety or operation safety greatly , and even results in disaster when prevention measures are not correct taken. Through tunnel construction a new drainage channel is formed and the conditions of recharge, flow, drainage are locally changed. So the conditions of recharge, flow, drainage in tunnel zone must be firstly estimated in order to put forward the countermeasures for water inflow disaster. The author attempts to research into the underground water flow path in tunnel and estimates the hydrodynamic parameters through various tests in order to provide reliable geological theoretical basis for the prevention and treatment of tunnel water inflow.
机译:隧道施工期间,水流入通常会发生极大地影响施工安全或运营安全,甚至在预防措施不正确时导致灾难。通过隧道施工形成新的排水沟,并在局部地改变充电,流量,排水的条件。因此,必须首先估计隧道区的充电,流量,排水的条件,以提出水流入灾难的对策。作者试图通过各种测试研究隧道中的地下水流路径,估计流体动力学参数,以便为隧道水流入的预防和治疗提供可靠的地质理论依据。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号