首页> 外文会议>ASME international pipeline conference >Pipeline Integrity Management - Estimating and Prioritizing the Risk Resulting From Pipeline Facility Operations
【24h】

Pipeline Integrity Management - Estimating and Prioritizing the Risk Resulting From Pipeline Facility Operations

机译:管道完整性管理 - 估算并优先考虑管道设施运营所产生的风险

获取原文

摘要

Recent efforts to develop a consistent approach to understanding the risk associated with operating a cross country pipeline have focused primarily on the pipe itself. Integrity management plans often include a prioritized risk profile that all but ignores the specific risks associated with operating tank farms, terminals, pumps and compression. This paper outlines a detailed logical approach that can be utilized to evaluate the relative safety, environmental and cost risk associated with operating diverse types of equipment within a pipeline station. Topics covered include the basic objectives of a facility risk model while providing the detail (granulation) necessary to continuously improve. A specific methodology is suggested as a systematic tactic to make an "apples to apples" comparison of diverse stations, lines and types of equipment, from a risk standpoint.
机译:最近努力制定一致的方法来了解与操作越野管道相关的风险主要集中在管道本身上。完整性管理计划通常包括优先考虑的风险配置文件,即所有但忽略了与运行坦克农场,终端,泵和压缩相关的特定风险。本文概述了一种详细的逻辑方法,可用于评估与管道站内运行不同类型的设备相关的相对安全性,环境和成本风险。涵盖的主题包括设施风险模型的基本目标,同时提供不断改进所需的细节(造粒)。建议特定方法作为系统策略,从风险的角度来看,制作“苹果”的“苹果”比较各种站点,线条和设备类型的比较。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号