首页> 外文会议>Annual Meeting of the Canadian Mineral Processors >ACHIEVING A GREAT START-UP: ACTION PLAN TO MAXIMISE YOUR CHANCES OFSUCCESS
【24h】

ACHIEVING A GREAT START-UP: ACTION PLAN TO MAXIMISE YOUR CHANCES OFSUCCESS

机译:实现一个伟大的创业公司:行动计划最大化您的成功机会

获取原文

摘要

The start-up of new plants, extending from the commissioning of equipment to the production ramp-up, is a critical period where the processing circuit operation must be done in a structured and well controlled way to enable the gradual, safe and rapid achievement of production targets. The magnitude of the many risks associated with this pivotal period is accentuated in the actual context of low commodity prices. However, the implementation of a method that analyzes risks associated with a start-up, their probability of occurrence and their impacts leads to the identification of a series of preventive actions that can be applied in order to reduce potential negative impacts.Soutex has been involved in numerous start-ups over the last few years and has developed a structured methodology to assess this crucial period, maximize the pre-start-up preparation, ensure a smoother and safer ramp-up period and minimize the time needed before reaching commercial production.This paper describes a method to identify preventive actions to apply in order to reduce risks related to a plant start-up. Then, the various steps of the method are demonstrated using the industrial case study of the Canadian Malartic gold plant situated in Abitibi, Quebec. The specific preventive actions, during start-up, the organisational measures and the ramp-up plan are detailed as they were effectively achieved. Finally, the post start-up actions are presented as well as some key results illustrating the achievement of their prior defined objectives.
机译:从设备调试到生产加速的新工厂的启动是一个关键时期,即加工电路操作必须以结构化和良好的控制方式进行,以实现逐步,安全和快速的实现生产目标。与这种关键时期相关的许多风险的大小在低商品价格的实际背景下突出。然而,分析与启动相关的风险的方法,它们的发生概率及其影响导致识别可以应用的一系列预防措施,以便减少潜在的负面影响.Soutex已涉及在过去几年中,在众多初创性上,已经开发出一种结构化方法来评估这一关键时期,最大限度地提高预启动准备,确保更平滑和更安全的加速时间,并最大限度地减少在达到商业生产之前所需的时间。本文介绍了一种识别申请预防措施的方法,以减少与工厂启动相关的风险。然后,使用位于魁北克阿布里比比的加拿大留着品金厂的工业案例研究来证明该方法的各种步骤。在初创期间,组织措施和加速计划的具体预防措施详细说明他们有效地实现。最后,提出了初始启动操作以及说明其先前界定目标的一些关键结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号