首页> 外文会议>Annual Meeting of the Canadian Mineral Processors >BLOOM LAKE: FLOWSHEET IMPROVEMENT AND RECOMMISSIONING
【24h】

BLOOM LAKE: FLOWSHEET IMPROVEMENT AND RECOMMISSIONING

机译:布鲁姆湖:流动改善和重新推荐

获取原文

摘要

Quebec Iron Ore Limited (QIO), a subsidiary of Champion Iron Limited (Champion), secured assets in early 2016 from the previous Bloom Lake operations in the heart of the Labrador Trough region of Northern Quebec, Canada. A plan was developed to bring the Bloom Lake facility back in operation once the iron ore market conditions improved. The project restart involved several aggressive moves to change operational effectiveness, one of which was the utilization of the existing Phase 1 Plant with an upgraded process flowsheet and equipment. The production target was 7.4 million tonnes per annum of 66% iron ore concentrate with an approximate 10% increase in iron ore recovery. The Phase 1 upgraded flowsheet was initially based on review of historical Phase 1 data and pilot testing data undertaken during the original Phase 1 operation and was finalized once additional metallurgical test work and process modeling was carried out by Mineral Technologies in late 2016. The final upgraded flowsheet is comprised of rougher spirals, rougher middling scavenging spirals, and an up-current classifier (UCC) with overflow scavenging spiral stage. A portion of the gravity circuit tailings treated by a series of wet high intensity magnetic separators (WHIMS) to boost overall iron recovery. This paper will describe the efforts taken to test and design the Bloom Lake Phase 1 upgraded flowsheet and report on the plant performance since commissioning in first quarter of 2018.
机译:魁北克铁矿有限公司(QIO),冠军钢铁有限公司(冠军)的子公司,在北魁北克,加拿大的拉布拉多地槽区的心脏地带,从以前的布鲁姆湖行动,担保资产在2016年年初。一个计划的开发是为了带来操作,一旦铁矿石市场条件明显改善布鲁姆湖设施回来。涉及到几个积极的动作项目重启改变操作有效性,其中之一是现有的第1阶段植物的利用与升级工艺流程和设备。生产目标是每66%的铁精矿每年740万吨与铁矿石回收大约10%的增加。第一阶段的升级流程最初是基于历史阶段的数据和原来的第一阶段工作期间进行试点测试数据的审查和一次额外的冶金测试工作和流程建模是在2016年年底。最终升级开展矿产技术定稿流程图是由较粗糙的螺旋,粗糙中等清除螺旋,以及上分级器(UCC)与溢流螺旋扫气阶段的。由一系列湿式强磁性分离器(WHIMS)的处理的重力电路尾矿的一部分,以提高整体铁回收率。本文将说明采取测试的努力和设计上的设备性能的布鲁姆湖一期升级流程和报告,因为在2018年第一季度投产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号