首页> 外文会议>Annual conference and expo of the International Erosion Control Association >SR 188 Resort Road to Devore Wash Intermediate BMPs on highway projects
【24h】

SR 188 Resort Road to Devore Wash Intermediate BMPs on highway projects

机译:SR 188 Resort Road Devore Shoft Modere Bmps在公路项目上

获取原文

摘要

The Arizona Department of Transportation (ADOT) improved and expanded SR188 from the City of Globe to Roosevelt Lake, a distance of about 30 miles. This project included 8 miles of new highway in mountainous terrain with 6 new bridges, 70 pipes and box culverts, an animal crossing, transplanting of 1000 cacti and 2 million yards of excavation costing $30 million. This case study reviews the use and application of BMPs but also explores the concept of intermediate BMPs, filling a gap between temporary BMPs and permanent erosion control measures.
机译:亚利桑那州的交通部(Adot)从地球城到罗斯福湖(罗斯福湖)的距离有所改善和扩展,距离约30英里。该项目包括8英里的山地地形新高速公路,拥有6个新的桥梁,70个管道和盒子涵洞,动物过境,造成1000仙仙女的移植和200万米的挖掘成本为3000万美元。本案例研究审查了BMP的使用和应用,但也探讨了中间BMP的概念,填补了临时BMP与永久性侵蚀控制措施之间的差距。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号