The design-build delivery system is being used to erect the landmark Christopher Bond Bridge as part of the kclCON project. The cable-stayed bridge is currently under construction and will span the Missouri River on I-29/35 in Kansas City, Missouri. The design-build process for the foundation work on this project has been successfully implemented as a result of cooperative efforts between the foundation designers and the constructors to develop a constructible design.
展开▼