AN INVESTIGATION OF PILE FOUNDATIONS INSTALLED DURING THE LATE 19 TH AND EARLY 20 TH CENTURY FOR RE-USE IN BUILDING SUPPORT

机译:安装在第19世纪后期和20世纪初安装桩基的调查,以便在建筑支持中重新使用

获取原文

摘要

A proposed rehabilitation of a 200,000 sf, 75-foot high steel-frame building at the former U.S. Navy Yard in Brooklyn, New York required the review of existing foundation data and an investigation of the foundations with respect to their condition. The building was constructed in stages between 1856 and 1933, including several expansions and interior equipment with isolated foundations. The building has clear spans on the order of 50 feet and at one time supported cranes allowing transport of heavy equipment through the building. The proposed rehabilitation is to include a food manufacturing center and office space having multiple stories. Original construction drawings, available from the Brooklyn Navy Yard Development Corporation’s drawing archive, were reviewed to determine the foundation system supporting the structure. The original drawings provide a window into the methods utilized during late 19th and early 20th century pile foundation construction. The review revealed that the building is supported by pile foundations ranging from timber to concrete-filled steel pipe (depending on the year of construction). Annotations including pile driving records were available on some drawings indicating the design and as-built capacity (using the ENR formula for driving resistance). An investigation consisting of test borings was performed to identify the subsurface conditions underlying the building for evaluating theoretical capacity of the piles. A test pit investigation was performed against existing columns within the structure to expose the piles and pile caps for inspection pertaining to pile condition. The test pit investigation revealed methods utilized during original construction to integrate new columns with existing floor slabs, the use of below-grade brick arches to support a floor slab, and the condition of timber piles which were likely installed up to 120 years ago. The observations made within the test pits were compared with original drawings to evaluate the accuracy of these drawings.
机译:纽约布鲁克林前美国海军院子的拟议康复为200,000卢比,75英尺高的钢铁架构建筑,要求审查现有的基础数据以及对其条件的基础调查。该建筑以1856年至1933年至1933年的阶段构建,包括具有孤立基础的几种扩展和室内设备。该建筑在50英尺的顺序和一次性支撑起重机上有明显的跨度,允许通过建筑物运输重型设备。拟议的康复将包括食品制造中心和具有多个故事的办公空间。综述原始施工图纸可从布鲁克林海军院子开发公司的绘图存档中获取,以确定支持该结构的基础系统。原图提供了一个窗口进入19世纪后期和20世纪初桩基建设中使用的方法。审查显示,该建筑由木材到混凝土钢管的桩基(取决于建筑年)的支持。在某些图纸上提供包括桩驾驶记录的注释,指示设计和嵌入的容量(使用eNF公式进行驱动电阻)。进行了由测试钻孔组成的调查,以确定建筑物的地下条件,以评估桩的理论能力。针对结构内的现有柱进行测试坑调查,以暴露桩和桩帽,以进行桩状的检查。测试坑调查揭示了原始施工期间利用的方法,将新柱与现有楼板集成,使用以下级砖拱门支撑楼板,以及最可能安装在120年前的木材桩的状况。将测试凹坑内的观察结果与原始图纸进行比较,以评估这些图纸的准确性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号