首页> 外文会议>Annual International Symposium of the International Council on Systems Engineering >Paradox of the Bermuda Triangle Applying Systems Engineering in a PPP-environment
【24h】

Paradox of the Bermuda Triangle Applying Systems Engineering in a PPP-environment

机译:百慕大三角的悖论在PPP环境中应用系统工程

获取原文
获取外文期刊封面目录资料

摘要

Applying Systems Engineering to a Public Private Partnership (PPP) contract requires a closed-loop control between the project goals, the project management and the content itself. Unexpected events, contradicting incentives and many more reasons can easily open the closed-loop without initially being perceived. All parties involved should participate actively at peer levels in order to assure the closed-loop control. The transparent and phased approach of Systems Engineering supports achieving this peer level closed-loop control.
机译:将系统工程应用于公共私人伙伴关系(PPP)合同需要项目目标,项目管理和内容本身之间的闭环控制。意外事件,矛盾的激励措施和更多原因可以很容易地打开闭环而不初步被感知。所涉及的各方应在同行级别积极参与,以确保闭环控制。系统工程支持的透明和分阶段方法实现该对等级闭环控制。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号