【24h】

Usability Aspects of WCET Analysis

机译:WCET分析的可用性方面

获取原文

摘要

Knowing the program timing characteristics is fundamental to the successful design and execution of real-time systems. A critical timing measure is the worst-case execution time (WCET) of a program. Often, timing analysis in industry is done by measurements. Recently, tools for deriving WCET estimates have reached the market. With more widespread use of WCET tools in industry, the usability aspects of these tools will be of growing importance. In this paper we discuss usability using the results of the WCET Challenge 2006, which was the first event that compared different WCET tools using the same set of benchmarks. Another source of input to the discussion are experiences from industrial case-studies of WCET tools. Finally, we point out some areas for future research and development for WCET analysis methods and tools.
机译:了解节目时序特征是成功设计和执行实时系统的基础。关键时序测量是程序的最坏情况执行时间(WCET)。通常,工业中的时间分析是通过测量完成的。最近,导出WCET估计的工具已达到市场。随着WCET工具在行业中更广泛使用,这些工​​具的可用性方面将越来越重要。在本文中,我们使用WCET挑战2006的结果讨论可用性,这是使用相同的基准组比较不同的WCET工具的第一个事件。讨论的另一个输入来源是WCET工具的工业案例研究的经验。最后,我们指出了WCET分析方法和工具的未来研发领域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号