Rock slope stability analysis for a slope in the vicinity of take-off yard of Karun-3 Dam

机译:Karun-3大坝附近的坡度斜坡稳定性分析

获取原文

摘要

Karun-3 is a 205 m high concrete dam constructed at 28 km to the south of Izeh in Iran.The objectives of the construction of this Dam & Hydro-electric Power Plant are electric Power supply and floodcontrol. Karun-3 power generators are connected to the National Power network as the Peak Power generation.With this power plant being operated,with the capacity of 2000 MW,and an average electric power generationof 4137 GW.h/y,a major portion of the electric power shortage in the country will be met. The underground powerhouse complex in this dam is one of the largest of its kind in the world,includingpowerhouse and transformer caverns,inlet valve gallery and related tunnels,two of which transfers electricityfrom the transformer cavern to the take-off yard at the surface. The take-off yard has been placed at the toe of a very dangerous slope named G2M,which seemed to beinstable after the excavation of the yard. This paper is dealing with the stability analysis of rock slope placedabove the take-off yard and proposes the method of stabilizing the slope without which the power plant wouldconfront many difficulties.
机译:Karun-3是一个205米的高混凝土坝,伊朗伊西岛28公里。该大坝和水电站建设的目标是电力供应和洪流。 Karun-3发电机与国家电网连接到峰值发电。该电厂运行,容量为2000兆瓦,以及4137 GW.h / Y的平均电力发电,主要部分将满足该国的电力短缺。在此坝地下厂房复杂是最大的同类在世界上,includingpowerhouse和变压器溶洞,进气阀通道及相关的隧道,其中两个转移electricityfrom变压器洞穴到起飞码在表面之一。起飞院子被放置在一个名为G2M的非常危险的斜坡的脚趾上,这在院子的挖掘后似乎是不可行的。本文正在处理岩石斜坡的稳定性分析,该岩石放弃了院子,提出了稳定斜坡的方法,无需将电厂不会困难。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号