Rock slope stability analysis for a slope in the vicinity of take-off yard of Karun-3 Dam

机译:Karun-3大坝起飞场附近边坡的岩质边坡稳定性分析

获取原文
获取原文并翻译 | 示例

摘要

Karun-3 is a 205 m high concrete dam constructed at 28 km to the south of Izeh in Iran.The objectives of the construction of this Dam & Hydro-electric Power Plant are electric Power supply and floodcontrol. Karun-3 power generators are connected to the National Power network as the Peak Power generation.With this power plant being operated,with the capacity of 2000 MW,and an average electric power generationof 4137 GW.h/y,a major portion of the electric power shortage in the country will be met. The underground powerhouse complex in this dam is one of the largest of its kind in the world,includingpowerhouse and transformer caverns,inlet valve gallery and related tunnels,two of which transfers electricityfrom the transformer cavern to the take-off yard at the surface. The take-off yard has been placed at the toe of a very dangerous slope named G2M,which seemed to beinstable after the excavation of the yard. This paper is dealing with the stability analysis of rock slope placedabove the take-off yard and proposes the method of stabilizing the slope without which the power plant wouldconfront many difficulties.
机译:Karun-3是一座高205 m的混凝土大坝,建于伊朗伊泽(Izeh)以南28公里处。该大坝和水力发电厂的建设目标是电力供应和防洪。 Karun-3发电机作为峰值发电装置连接到国家电网。该发电厂的运行容量为2000 MW,平均发电量为4137 GW.h / y,是该发电站的主要部分。该国电力短缺将得到解决。该水坝的地下厂房是世界上最大的地下厂房,包括厂房和变压器洞,进水阀廊和相关的隧道,其中两个将电力从变压器洞传输到地面的起飞场。起飞场已放置在一个非常危险的斜坡G2M的脚趾上,该斜坡在场开挖后似乎无法稳定。本文对起飞场上方岩石边坡的稳定性进行了分析,提出了一种边坡稳定的方法,如果没有该方法,电厂将面临许多困难。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号