首页> 外文会议>International Symposium on Landslides and Engineered Slopes >Deformition characteristics and stability evaluation of Ganhaizi landslide in the Dadu River
【24h】

Deformition characteristics and stability evaluation of Ganhaizi landslide in the Dadu River

机译:甘白区滑坡在达杜河的稳定性特征及稳定性评价

获取原文

摘要

Ganhaizi landslide,about 19790×104m3,is located on the right bank of the Dadu River. Thereare two cracks and one creep body in the accumulation of Ganhaizi landslide. The potential slippage volume ofthe accumulation involved by each deformation body is more than 10×104m3. Cracks 1 and 2 are located inthe middle part of Ganhaizi landslide,while the creep body is situated at the south of the landslide body. Severalsprings are found to the southwest of the staggered platform. The spring flows perennially and keeps limpid inflood period. The accumulation of Ganhaizi landslide is so huge that it may frighten the upstream hydropowerproject (3 km away). Therefore,its stability evaluation is extremely important. The analysis shows that rainstormor earthquake will induce Ganhaizi landslide only partly reactive,but the whole landslide is stable. The areaof potential instability is small,and it cannot surge or dam Dadu River again. In a word,the accumulation ofGanhaizi landslide has little influence on the hydropower project.
机译:Ganhaizi Landslide,约19790×104m3,位于右岸的大河河畔。在甘盛滑坡积累中,两种裂缝和一个蠕变的身体。每个变形体涉及的积累的潜在滑动量大于10×104m3。裂纹1和2分别位于在矿井甘海子滑坡的中间部分,而蠕变体位于在滑体南部。 Semeralsprings被发现在交错平台的西南。春季平稳地流动并保持迷水的空间。 Ganhaizi Landslide的积累是如此庞大,它可能会吓到上游水电产品(距离3公里)。因此,其稳定性评估非常重要。分析表明,Raintorvor地震将诱导Ganhaizi Landslide仅部分反应,但整个滑坡都是稳定的。潜在不稳定的区域很小,它不能再次飙升或大坝河。总而言之,奥根齐山脉的积累对水电项目影响不大。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号