首页> 外文会议>International Symposium on Landslides and Engineered Slopes >Properties of the high rock slope of Hongjiadu hydropower project and its engineering treatment measures
【24h】

Properties of the high rock slope of Hongjiadu hydropower project and its engineering treatment measures

机译:红木水电工程高岩石坡的特性及其工程治理措施

获取原文

摘要

The dam site of Hongjiadu CFRD is located in the area with high mountains,narrow valley andKarstic formation. The river bank is very steep and developed with soft intercalations. The height of the leftabutment rock slope is 310 m and the height of the large scale bedding slope of intakes is more than 360 m.The scale and the height of those slopes are rarely finding both at home and abroad. It is the main difficulty forthe construction of the project. By using different methods to determine the strength parameters and applyingmultiple slope stability analysis methods,several engineering measures were accepted,which include the timelyanchoring during excavation,continuous narrow plinth with constant length,huge anti-slide piles plus anchorcables,etc. The measures have successfully solved the high slope problems of the project. Now,the slope hasbeen safely operated for 3-6 years and still in good condition.
机译:洪家堂CFRD的大坝现场位于山脉高山的地区,狭窄的山谷和卡斯蒂山脉。河岸非常陡峭,伴有软插值。 Leftabutment Rock斜率的高度为310米,摄入量的大规模卧床坡度的高度超过360米。规模和这些斜坡的高度很少在国内外找到。这是项目建设的主要困难。通过使用不同的方法来确定强度参数和应用多个边坡稳定性分析方法,接受了几种工程措施,其中包括在挖掘过程中的及时支线,连续窄柱,恒定长度,巨大的抗滑动桩加锚固等。这些措施已成功解决了该项目的高斜率问题。现在,坡度已经安全运行3-6年,仍处于良好状态。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号