首页> 美国政府科技报告 >Rock Slope Engineering Reference Manual. Part E: Rock Slope Stabilization, Protection and Warning-Instrumentation Measures and Related Construction Considerations
【24h】

Rock Slope Engineering Reference Manual. Part E: Rock Slope Stabilization, Protection and Warning-Instrumentation Measures and Related Construction Considerations

机译:岩坡工程参考手册。 E部分:岩质边坡稳定,保护和警告 - 仪表措施及相关的施工考虑因素

获取原文

摘要

Remedial measures for rock slopes can consist of stabilization, protection, or warning methods, or a combination of these three basic methods. A description of the three basic approaches which can be used to remedy rock slope problems is as follows: Stabilization Methods-These methods give a positive solution to the problem in that either the driving forces are reduced or the resisting forces are increased; Protection Methods-These methods prevent rock materials which have moved out of place on the slope from reaching the roadway, thus also offering a positive solution to slope stability problems; Warning and Instrumentation Methods-These methods provide a forewarning that movements have taken place, or that failure has occurred and a hazard may be imminent in the vicinity of the roadway.

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号