PREFILLED EQUIPMENT BASEPLATES-HOW TO GET A SUPERIOR EQUIPMENT INSTALLATION FOR LESS MONEY

机译:预先填写的设备底板 - 如何获得较少的货币设备的卓越设备

获取原文

摘要

This paper outlines a new void-free baseplate installation method that saves over 30 percent of the installation costs, when compared to traditional two-pour grouting methods. Common field installation problems are discussed, and new insights are presented to show the causes and corrections. For installations utilizing cement based grouting systems, the paper shows how to greatly improve the bond between the grout and the baseplate, when using the prefilled method. A new installation technique is also introduced that utilizes a thin-pour epoxy grout system. When coupled with a prefilled baseplate, this new technique will greatly reduce the total installed cost for machinery baseplates. A complete breakdown of the installation costs is provided to justify the cost savings.
机译:本文概述了一种新的无效底板安装方法,与传统的双浇注方法相比,可节省超过30%的安装成本。讨论了公共场安装问题,并提出了新的见解来展示原因和校正。对于利用基于水泥的灌浆系统的安装,当使用预先填充的方法,如何大大改善灌浆和底板之间的粘合。还引入了一种新的安装技术,其利用薄倒入环氧树脂灌浆系统。当加上预先填充的底板时,这种新技术将大大减少机械底板的总安装成本。提供了完全分解安装成本,以证明成本节省。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号