首页> 外文会议>International Conference on Pipeline Integrity >Is external corrosion direct assessment a valid approach for pipeline integrity management?
【24h】

Is external corrosion direct assessment a valid approach for pipeline integrity management?

机译:外部腐蚀直接评估管道完整性管理的有效方法吗?

获取原文

摘要

ASME B31.8S states that the objective of direct assessment is to determine the integrity of a pipeline. A pipeline requires repair when corrosion features exceed 80% wall thickness or when the length and depth of a feature are such that the line is at risk of rupture. A series of case studies are presented to investigate whether direct assessment can identify such features. The indirect examination phase of Direct Assessment lacks the required precision to identify critical defects. However the pre-assessment phase is critical and plays a key role in the definition of the excavation sites for direct examination.
机译:ASME B31.8S指出,直接评估的目标是确定管道的完整性。当腐蚀特征超过80%壁厚或特征的长度和深度使得该线有破裂的风险时,管道需要修复。提出了一系列案例研究以调查直接评估是否可以识别这些功能。直接评估的间接检查阶段缺乏所需的精确度,以确定关键缺陷。然而,预评估阶段至关重要,并在挖掘站点的定义中发挥关键作用以进行直接检查。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号