首页> 外文会议>National Meetings of the American Society of Mining and Reclamation >ADAPTIVE WATERSHED MANAGEMENT IN THE COPPER BASIN: EVALUATION OF EARLY SUCCESSES
【24h】

ADAPTIVE WATERSHED MANAGEMENT IN THE COPPER BASIN: EVALUATION OF EARLY SUCCESSES

机译:铜盆地的自适应流域管理:早期成功的评价

获取原文

摘要

The Copper Basin Mining District Site (Site) has been host to 150 years of copper mining, beneficiation and mineral processing, and sulfuric acid and other chemical production processes that have left a legacy of environmental degradation that has affected the Ocoee River. In order to improve the health of the Ocoee River, the US Environmental Protection Agency, Tennessee Department of Environment and Conservation, and Glenn Springs Holdings, Inc. a subsidiary of Occidental Petroleum Company, agreed to conduct a cooperative, voluntary environmental restoration and redevelopment of the Copper Basin. Part of this agreement was to develop and implement interim actions to alleviate contaminant loading to the Ocoee River so that short-term progress could be realized while long-term remedial actions were identified and implemented in upper parts of the watersheds. Use of an adaptive management approach to watershed restoration has resulted in early identification of the most significant problems. The major benefit of this process has been early remediation of the worst problems in a complex set. This has allowed valuable resources traditionally utilized for full site characterizations to be applied toward remedial activities, which could potentially change the original character of the Site. Results of the early restoration successes in this hard-rock mining impacted watershed are presented along with long-term remedial actions being conducted in upper parts of the watersheds. Measurable success has been achieved in part because of the flexibility resulting from regulatory collaboration and stakeholder cooperation.
机译:铜盆地采矿区网站(遗址)已持有铜矿,矿物质,矿物加工,硫酸和其他化学生产过程,留下了影响oCoee河的环境退化的遗产。为了改善ocoee河的健康,美国环境保护局,田纳西州环境保护署和格伦斯·普林斯控股公司,公司的子公司,同意开展合作,自愿的环境恢复和重建铜盆地。本协议的一部分是制定和实施临时行动,以减轻对OCOEE河流的污染物装载,以便可以实现短期进度,同时在流域的上部确定并实施长期补救措施。使用自适应管理方法对流域恢复导致了早期确定最重要的问题。这一进程的主要好处是早期修复复杂集中最严重的问题。这使得传统上使用的有价值的资源用于适用于补救活动的完整场地特征,这可能会改变现场的原始特征。这种硬摇滚挖掘的早期恢复成功的结果呈现出在流域上部进行的长期补救措施。由于监管合作和利益相关方合作导致的灵活性,已经取得了可衡量的成功。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号