首页> 外文会议>IEEE Particle Accelerator Conference >DIAGNOSTIC AND TIMING SUPPORTS FOR TOP-UP INJECTION OPERATION FOR THE TLS
【24h】

DIAGNOSTIC AND TIMING SUPPORTS FOR TOP-UP INJECTION OPERATION FOR THE TLS

机译:诊断和定时支持TLS的充值注入操作

获取原文

摘要

Routine top-up operation of Taiwan Light Source (TLS) was to commence from October 2005 after high efficiency multi-bunch instabilities suppression system put into service. Long-term 360mA top-up operation has been tested and proven its successful and steady performance. Short-term 400mA top-up run is also demonstrated. The TLS is current operated at 300mA top-up mode to compromise various requirements of users at this moment. Higher current is possible in future. To support the top-up operation, various diagnostics and timing control are needed. These include diagnostics for injection efficiency, filling pattern of the storage ring, tune, instability, loss pattern measurement. Timing control of the injection process is also necessary. Further possible improvement will be also discussed.
机译:台湾光源(TLS)的常规充值运行是从2005年10月开始的高效多束不稳定性抑制系统投入使用。已经测试了长期360mA充值操作,并证明其成功稳定的性能。还证明了短期400mA充值运行。 TLS电流在300mA充值模式下操作,以损害此刻用户的各种要求。未来可能更高的电流。为了支持充值操作,需要各种诊断和定时控制。这些包括注射效率的诊断,储存环的填充图案,调谐,不稳定性,损耗模式测量。还需要对注射过程的定时控制。还将讨论进一步可能的改进。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号