首页> 外文会议>International Technical Meeting of the Satellite Division of The Institute of Navigation >Global Positioning Systems Directorate - GPS Status Modernization Progress: Service, Satellites, Control Segment, and Military GPS User Equipment - (PPT)
【24h】

Global Positioning Systems Directorate - GPS Status Modernization Progress: Service, Satellites, Control Segment, and Military GPS User Equipment - (PPT)

机译:全球定位系统理事会 - GPS状态和现代化进步:服务,卫星,控制部门和军用GPS用户设备 - (PPT)

获取原文

摘要

SV01 successfully completed post-ship functional testing. SV02 declared Available For Launch (AFL) on 10 Aug 18. Spacecraft is in short-term storage. SV03 acoustics testing prep is ongoing: - Solar array testing in work; - Shipped to Reverberant Acoustic Laboratory (RAL) on 7 Sep 18; - Completed Thermal Vacuum (TVAC) on Jun 2018. SV04 in TVAC Chamber on 30 Aug 18: - Open door testing to begin on 4 Sep 18. SV05 core mating is in progress. SV06 is currently integrating harnesses. SV07 is currently in Assembly buildup stage.
机译:SV01成功完成了船后功能测试。 SV02于8月10日宣布推出推出(AFL)。航天器是短期储存。 SV03声学测试准备正在进行: - 工作中的太阳能阵列测试; - 在7月7日9月18日运到混响声学实验室(RAL); - 2018年6月30日完成了热真空(TVAC)。18年8月30日TVAC室中的SV04: - 开放式门测试于4月18日开始。SV05核心交配正在进行中。 SV06目前正在整合利束。 SV07目前在装配积累阶段。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号