首页> 外文会议>Annual International Meeting of the American Society of Agricultural and Biological Engineers >Design, Development and Testing of an Engineered Alligator Culture Facility
【24h】

Design, Development and Testing of an Engineered Alligator Culture Facility

机译:设计,开发和测试工程鳄鱼宣传者文化设施

获取原文

摘要

American alligators (Alligator mississippiensis) are now a cultured species of significant economic and ecological importance in Louisiana and other southeastern US states. A limited number of locations have studies ecological, biological, economic, disease and processing aspects of alligator culture. However, facilities have been modest and generally have not had significant engineering input.Current work on an alligator facility funded jointly between the LSU AgCenter and the Louisiana alligator industry has allowed development of what is believed to be the first engineered crocodilian facility in the world. The project includes geothermal water heating, automated water flow control, temperature and air flow control, data acquisition, independentwater depth and temperature control on 24 tanks, each 4 feet by 8 feet with maximum depth of 2 feet (1.2 x 2.3 x 0.5m depth) each with independent temperature control. The temperature control is accomplished with the help of two 6000 gallon (24,0001) water holding tanks which acquire and hold water from a geothermal well (30-35C); recycle water to natural gas fired heaters (to raise temperature to within 1 degree of desired final temperature); and 1000W electric insertion heaters for final heating. Campbell Scientific data acquisition and control hardware and software was customized to control heating, flow control and fans.A separate component of the facility is a quarantine facility with independent water and air flow control for studying diseased or challenged animals. Expected studies include alligator biology, feeding, disease, water quality, waste management and related work which this design now facilitates.
机译:美国鳄鱼队(鳄鱼群体密西西比人)现在是路易斯安那州和美国东南部的大量经济和生态重要性的培养物种。有限数量的地点研究了鳄鱼培养的生态,生物,经济,疾病和加工方面。然而,设施一直谦虚,一般没有重大的工程投入。在LSU Accenter和路易斯安那州鳄鱼产业之间联合资助的鳄鱼设施的每股正常工作允许发展被认为是世界上第一个设计的第一款工程鳄鱼工厂。该项目包括地热水加热,自动化水流控制,温度和空气流量控制,数据采集,独立水深和24箱温度控制,每4英尺乘8英尺,最大深度为2英尺(1.2 x 2.3 x 0.5m深度)各有独立的温度控制。借助于两台6000加仑(24,0001)水持有罐完成温度控制,该罐从地热井(30-35℃)中获取和保持水;将水循环到天然气烧制加热器(将温度提高到1度所需的最终温度范围内);和1000W电气插入加热器用于最终加热。坎贝尔科学数据采集和控制硬件和软件被定制,以控制加热,流量控制和粉丝。设施的单独部件是具有独立水和空气流量控制的隔离设施,用于研究患病或挑战动物。预期研究包括这种设计现在有助于的鳄鱼生物学,饲养,疾病,水质,废物管理和相关工作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号