The use of secant pile walls in the rehabilitation of the Pohick Creek Dam No. 2 (Lake Barton) auxiliaryspillway

机译:使用剪辑桩墙在Pohick Creek Dam Node 2(Barton Lake Barton)辅助溢洪道的康复

获取原文

摘要

Pohick Creek Dam No. 2, known as Lake Barton, was built in 1978 in Fairfax County, Virginia. This structure was built as a high hazard dam due to its location in an urban environment. In 2004, the Virginia Division of Dam Safety issued a conditional certificate for Operation and Maintenance because the vegetated earthen auxiliary spillway could not pass the Probable Maximum Flood without breaching the structure. Under the authority of the Small Watershed Amendments of 2000 (PL 106-472), the USDA Natural Resources Conservation Service prepared a rehabilitation plan for the dam. The plan provided for building a reinforced concrete wall at the end of the control section and a concrete secant pile wall at the end of the constructed outlet section. Construction was completed in 2010. The secant pile wall was constructed of 79 alternating reinforced and non-reinforced concrete piles drilled an average of 68 feet into the ground. Tieback anchors were utilized to prevent the secant wall from overturning inthe event the downstream material was removed during the design event. A 6.6 foot deep reinforced concrete wall was installed across the 70-foot wide control section and up the side slopes to the elevation of the top of the dam. The footprint of the construction site was 0.7 acres, the construction time was 7 months, and the total construction cost was $2,808,715.
机译:Pohick Creek Dam No.2,被称为Barton Lake Barton,于1978年建于弗吉尼亚州费尔法克斯县。由于其在城市环境中的位置,这种结构是一个高危险的大坝。 2004年,弗吉尼亚州的大坝安全部门发出了一条条件证明的操作和维护证明,因为植被的土辅助溢洪道不能通过可能的最大洪水而不违反结构。根据2000年的小流域修正案(PL 106-472),美国农业部自然资源保护服务为大坝制定了康复计划。该计划为在控制部分的末端构建钢筋混凝土壁,并在构造出口部分的末端处的混凝土剪辑桩壁。建设于2010年完成。割桩壁由79个交替加强和非钢筋混凝土桩构成,平均钻入地面68英尺。利用连接锚来防止划线壁越过闭塞,在设计事件期间除去下游材料。将6.6英尺深钢筋混凝土墙安装在70英尺宽的控制部分上,并将侧倾斜坡上升到大坝顶部的升高。建筑工地的足迹为0.7英亩,施工时间为7个月,总建筑成本为2,808,715美元。

著录项

相似文献

  • 外文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号