【24h】

FREEPORT LNG LIQUEFACTION PROJECT

机译:FreePort LNG液化项目

获取原文

摘要

Freeport LNG Development, LP. (Freeport LNG), designed, built and now operates a world-class LNG receiving and regasification terminal in Freeport, Texas. Freeport LNG believes the abundance of domestic reserves and low prices mean that the U.S. gas market itself should become a source for LNG export. Given this dramatic reversal of market conditions, Freeport LNG has launched its natural gas liquefaction project, proposing to add approximately 13.2 million metric tonnes per annum (MTA) (1.9 billion cubic feet per day) of liquefaction capability to its Quintana Island terminal facilities. The feed gas will be derived from interconnecting intrastate pipeline systems, e.g., Dow Pipeline Company; Kinder Morgan Texas Pipeline, L.P.; Brazoria Interconnector Gas (BIG) Pipeline; or other yet-to-be-built pipeline(s), through Freeport LNG's existing Stratton Ridge meter station. The gas will be pretreated near Freeport LNG's existing metering, compression and underground storage facilities. The pretreated natural gas will then be delivered to the terminal through Freeport LNG's existing gas pipeline. At the terminal it will be liquefied and stored in full containment LNG storage tanks. LNG will be exported from the terminal by LNG carriers arriving via marine transit through the Freeport Harbor Channel. Effective January 30, 2012, Freeport LNG and a joint venture comprised of Zachry Industrial, Inc. and CB&I (Zachry/CB&I JV) entered into a front end engineering and design (FEED) contract for the engineering and design of the Freeport liquefaction terminal near Freeport, Texas. This paper presents the regulatory process, community relations, technical description, current status, and some of the challenges - including site preparation design - addressed during the FEED and ongoing development of the project.
机译:自由港液化天然气发展,LP。 (FreePort LNG),设计,建造,现在在德克萨斯州Freeport的世界一流的LNG接收和再扫描终端运营。 Freeport Lng认为,国内储备丰富,价格低价意味着美国天然气市场本身应该成为液化天然气出口的源泉。鉴于这种戏剧性的市场条件令人震惊的逆转,自由港液化天然气推出了其天然气液化项目,提出为其Quintana Island终端设施为其液化能力(MTA)每年(MTA)(MTA)(119亿立方英尺)增加约1320万公吨。饲料气体将来自互连的套管内管线系统,例如Dow管道公司; Kinder Morgan Texas Pipeline,L.P; Brazoria互联网(大)管道;或其他尚未建造的管道,通过Freeport LNG现有的Stratton Ridge Mette站。气体将在FreePort LNG现有的计量,压缩和地下储存设施附近进行预处理。然后将通过Freeport LNG现有的气体管道将预处理的天然气送到终端。在终端,它将液化并储存在完全遏制LNG储罐中。 LNG将由LNG运营商从终端出口,通过Freeport Harber频道通过海洋交通到达。 2012年1月30日,FreePort LNG和由Zachry Industrial,Inc。和CB&I(Zachry / CB&I JV)组成的合资企业进入了FreePort液化终端的工程和设计的前端工程和设计(Feed)合同Freeport,德克萨斯州。本文介绍了监管程序,社区关系,技术描述,当前状态,以及一些挑战 - 包括在饲料和持续发展期间的现场准备设计。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号