首页> 外文会议>SPE Middle East Oil Gas Show and Conference >Case Study in Water Shutoff Fluid Placement Using Straddled Through-Tubing Inflatable-Packers Technique
【24h】

Case Study in Water Shutoff Fluid Placement Using Straddled Through-Tubing Inflatable-Packers Technique

机译:采用跨越通过管道膨胀封装器技术的水截止液体放置的案例研究

获取原文

摘要

Most of the wells in Sabriya Field (Northern Kuwait) produce from reservoirs, where multiple layers are opened to production. Problems related to non-desired water production are drastically affecting the oil production, and have been an ongoing concern. The exclusion of this water represents a challenging task by itself especially in case of multiple zones interval simultaneously producing, and where completion of the wells restricts considerably the convoyed down-hole tools configuration This paper covers water shut off case history of an oil producer that has shown according to the production data an increasing water production figures. The nature of water problem and the fact that the targeted section is located in-between multiple oil producer zones revealed the necessity of a complex thru tubing zonal isolation solution before performing the water shut-off treatment. Temporary coiled tubing conveyed straddle system was created using two thru tubing inflatable packers, isolating the top and bottom perforated zones in order to provide both proper zonal isolation and accurate treatment placement. The post water shut off treatment showed up to 70% water flow reduction from the targeted layer has been achieved.
机译:Sabriya领域的大部分井(北科威特)从储层生产,多层开放生产。与非所需水产生产有关的问题急剧影响石油生产,并持续关注。这种水的排除本身是一个具有挑战性的任务,特别是在多个区域间隔同时产生的情况下,并且在井的完成范围限制的情况下,这些纸张覆盖了具有的石油生产者的水关闭案例历史根据生产数据显示的是增加水生产数字。水问题的性质和目标部分位于多个石油生产者区内的事实揭示了在进行水关闭处理之前复杂的通过管区分离溶液的必要性。临时卷绕管道输送的跨跨系统是使用两个通过两管充气封装器产生的,隔离顶部和底部穿孔区域,以提供适当的区域隔离和准确的处理放置。后水关闭处理显示出可实现目标层的水流量高达70%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号