首页> 外文会议>International Congress on Rock Mechanics >Comparison of field and numerical modelling data for the steel pipe umbrella arch applications
【24h】

Comparison of field and numerical modelling data for the steel pipe umbrella arch applications

机译:钢管伞拱应用领域与数值建模数据的比较

获取原文

摘要

Umbrella arch application is generally applied by using 4 inches Φ steel pipes. This application requires special experience and special machine for drilling holes to embed the 4 inches Φ steel pipes. In such a case, a machine to make umbrella arches in tunnel face, a machine to embed bolts at umbrella arch overthrust and also a machine to make excavation are required. As an alternative to this application, both excavation and umbrella arch application can be made with just one machine when 2 inches Φ steel pipe umbrella arch application is sufficient. Hereby, both a positive effect made on project costs by increasing machine usage rate and less amount steel pipes are used.
机译:伞拱应用通常通过使用4英寸Φ钢管施加。该应用需要特殊的经验和特殊机器,用于钻孔嵌入4英寸φ钢管。在这种情况下,在隧道面上制造伞拱的机器,需要在伞形拱门被嵌入螺栓的机器,并且需要一种机器来进行挖掘。作为本申请的替代方案,挖掘和伞拱应用只需一台机器即可,当2英寸φ钢管伞拱拱应用就足够了。因此,使用通过增加机器使用率和较少量的钢管对项目成本进行的积极效果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号