Simulator-Aided Instrumentation and Control System Refurbishment at Paks Nuclear Power Plant

机译:Paks核电站模拟器 - 辅助仪表和控制系统翻新

获取原文

摘要

Replacing the aging instrumentation and control system (I&C) in a nuclear power plant (NPP) is always a difficult task, even without the present energy-distribution disturbances in Europe and the more and more frequent plant-life-extension and power-up-rating projects. The NPP plant life-cycle tends to reach 50-60 years, while that of the I&C system is only 8-10 years. Not only the systems become obsolete: spare parts for the old system are practically nonexistent. Putting into operation reliable, thoroughly tested, verified and validated, approved by the authorities new systems could significantly increase the outage time of the units. However, about 90% of the work can be done off-line, by means of full scope replica simulators, and in the same time the operators become trained to these new systems, too. Taking this approach the refurbishment does not increase the outage time needed for refuelling and repair, at least not significantly. The paper describes this methodology in detail.
机译:在核电站(NPP)中取代老化仪器和控制系统(I&C)始终是一项艰巨的任务,即使没有欧洲的目前的能量分配干扰以及越来越多的植物寿命 - 延伸和上电 - 评级项目。 NPP植物生命周期往往达到50-60岁,而I&C系统的生命周期只有8 - 10年。不仅系统过时了:旧系统的备件实际上不存在。投入运营可靠,经过彻底的测试,核实和验证,经当局批准的新系统可能会显着增加单位的中断时间。然而,通过完整的范围副本模拟器,大约90%的工作可以脱离线路,并且同时,运营商也会对这些新系统进行培训。采取这种方法,翻新并没有增加加油和修理所需的中断时间,至少不会显着。本文详细介绍了该方法。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号