The Leamington kiln baghouse project: why, how and the outstanding results

机译:Leamington窑袋房项目:为什么,如何以及出色的结果

获取原文

摘要

Ash Grove Cement's Leamington, UT plant was constructed by Martin Marietta Corporation, Cement and Aggregate Division, in 1980 and produced "first clinker" on November 15, 1981. Now long past its original equipment design life, the plant is still running strong. Continuous plant improvements and modernization to the kiln and preheater have increased production over the years. The production increases high lighted bottlenecks, including insufficient draft through the kiln and vertical raw mill. The original mill baghouse was too small to handle the expanded load. The original two-fan kiln/mill baghouse system experienced high pressure losses due to increased gas flow and a requirement to lower the baghouse inlet temperature. The baghouse ID fan was unable to maintain its desired performance limiting production. In addition, the physical condition of the original reverse air baghouse had deteriorated due to abrasion wear and corrosion. Replacement of the old baghouse was decided upon for the 2004 spring shut-down. Production requirements for the year allowed only 28 days to replace the entire reverse air baghouse, ID fan, stack, material handling, and controls system with a state-of-the-art low pressure pulse-jet filter and upgraded equipment. The normal two week shut-down was extended to four weeks to accommodate the baghouse replacement. The revamped system's performance exceeded all expectations. Power consumption decreased and clinker production increased significantly. Even with the two week extension to a typical outage, in 2004, the revamped baghouse system allowed the Leamington plant set a production record. This paper describes the project, including the existing baghouse system, the project objectives, the vendor selection, the construction project and the post-project operational results.
机译:Ash Grove Cement的Leamington,UT植物是由Martin Marietta Corporation,Cement and Heglegate Division建造的,1980年11月15日制作了“第一熟熟料”。现在经过其原始装备设计生活,该植物仍在运行强劲。连续植物改进和现代化到窑和预热器多年来增加了产量。生产增加了高点亮瓶颈,包括通过窑和垂直原厂的涂料不足。原厂磨坊袋楼太小而无法处理膨胀负荷。原装双扇窑/轧机袋式系统由于气体流量增加,要求降低袋式入口温度,经历了高压损失。 Baguouse ID风扇无法维护其所需的性能限制性生产。此外,由于磨损磨损和腐蚀,原始反向气囊的物理状况劣化。替换旧袋屋是决定2004年弹簧关闭。每年的生产要求仅允许28天更换整个反向空气袋,ID风扇,堆叠,材料处理,并控制系统,具有最先进的低压脉冲喷气式滤波器和升级设备。正常的两周关闭延长至四周以适应袋式店更换。改进的系统的性能超出了所有期望。功耗下降,熟料产量显着增加。即使在典型中断的两个星期延伸,2004年,改进的袋式系统也允许Leamington Plant设定了生产记录。本文介绍了该项目,包括现有的袋式系统,项目目标,供应商选择,建设项目和项目后业务结果。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号