As the second largest bridge prqject in North Dakota after Four Bears Bridge, Liberty Memorial Bridge is a new 2,369-foot long bridge with four traffic lanes crossing the Missouri River in Bismarck, ND. The total cost of the bridge is estimated to be $48 million. Designs and construction documents were developed for two alternatives - concrete and steel bridges. This paper summarizes the designs for both alternatives and makes comparisons between the two types of structures regarding aesthetics, structural characteristics, and construction costs. The steel alternative consists of four steel box girders supported on tall piers with six river spans. The longest span is 285 feet. The concrete alternative is a cast-in-place segmental bridge consisting of two concrete box girders supported on split-"Y"-shaped piers. The upper legs of each pier, connected with external PT tendons, are in a plane parallel to bridge centerline. This alternative has six river spans with a maximum span of 315 feet. The concrete alternative for this project did not have a cost advantage over the steel alternative for many reasons, including a unique pier design, the increase of concrete unit prices and construction staging challenges.
机译:作为北达科他州的第二大桥Prqject,自由纪念桥是一个新的2,369英尺长的桥,有四个交通车道穿过密苏里河,在俾斯麦博士北部。桥梁的总成本估计为4800万美元。为两个替代品 - 混凝土和钢结构开发了设计和施工文件。本文总结了两种替代方案的设计,并在审美,结构特征和建筑成本之间进行两种结构之间的比较。钢铁替代方案由四个钢箱上的四个钢箱梁组成,六河跨越六河。最长的跨度是285英尺。具体的替代方案是一种由两种混凝土盒梁组成的铸造的节段,包括在分裂 - “y”桥墩上。每个码头的上腿与外部Pt腱连接,在平行于桥接中心线的平面中。这种替代方案有六条河流跨度,最大跨度为315英尺。由于许多原因,该项目的具体替代方案没有通过钢铁替代方案的成本优势,包括独特的码头设计,具体单位价格的增加和施工分期挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号