首页> 外文会议>European Photovoltaic Solar Energy Conference >EARLY DEGRADATION OF PV MODULES AND GUARANTY CONDITIONS
【24h】

EARLY DEGRADATION OF PV MODULES AND GUARANTY CONDITIONS

机译:PV模块的早期降解和担保条件

获取原文

摘要

CIEMAT PVLabDER has largely increased its demand on testing and characterizing PV plants, according to the fast growth of PV installed capacity in Spain. One of the topics in which manufacturers, promoters, and owners of the plants are more interested in, is the possible degradation of PV modules and its relationship to guarantee contracts, as it is related to subsidies. This paper presents some findings in campaigns of PV plants evaluation carried out during last years. This evaluation usually consists of visual inspection, I-V curve measurement in the fields (the whole plant or selected areas), thermal evaluation by IR imaging, and, in some cases, measurement of the I-V characteristic and thermal behaviour of selected modules in the plant, chosen by the laboratory. It must be noticed that new defects that grow when the module is into operation may appear in modules initially free of them (named as hidden manufacturing defects). Usually some of these hidden defects that only appear in normal operation are not detected in reliability tests (EN61215 or EN 61646) due to the different operational conditions of the module in the standard tests and in the field (serial-parallel connection of many PV modules, power inverter influence, over voltage on wires, etc.)
机译:Ciemat Pvlabder根据PV安装能力的快速增长,PVLabder在很大程度上增加了对PV工厂的测试和表征PV工厂的需求。其中植物的制造商,促销者和所有者更感兴趣的话题之一,是光伏模块的可能退化及其与保障合同的关系,因为它与补贴有关。本文介绍了在持续时间进行的光伏工厂评估的竞选结果。该评估通常由田地(整个植物或选定区域)中的视觉检查,IV曲线测量,IR成像热评估,并且在某些情况下,在植物中测量所选模块的IV特性和热行为,由实验室选择。必须注意到,当模块投入运行时的生长的新缺陷可能会出现在最初没有它们的模块中(命名为隐藏的制造缺陷)。通常,在可靠性测试(EN61215或EN 61646)中,这些隐藏缺陷通常不会在可靠性测试(EN61215或EN 61646)中,由于标准测试中的模块和现场的模块的不同操作条件(许多PV模块的串行连接,功率逆变器影响,电线上的电压等)

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号