Running a successful airport with projections of increasing passenger demand, the Raleigh Durham Airport Authority is building a replacement for their existing Terminal C. The new Terminal C will feature over 800,000 square feet of processor and concourse space and 30 gates. In addition to creating a first-rate passenger experience, the Authority expects to create a regional gateway and an architectural landmark. Construction began in the fall of 2004, with the phased demolition of portions of the existing Terminal C as required to make room for the first phase of the new terminal. This was followed by construction starts on a new Central Energy Plant and a portion of the terminal building foundations. At the time of this writing, the Authority is evaluating bids for the terminal building itself, with construction expected to begin shortly.
展开▼