首页> 外文会议>U.S./North American Mine Ventilation Symposium >Survey execution to build a ventilation model, Australian style
【24h】

Survey execution to build a ventilation model, Australian style

机译:调查执行建立通风模型,澳大利亚风格

获取原文
获取外文期刊封面目录资料

摘要

In an age of risk based logic, to ensure the safety of our people in all but the most benign of mine sites we simply cannot justify the absence of a well maintained model of their ventilation circuits. Most Australian mines, at least in the underground coal sector, maintain a validated model to assist with the change management process of minor to major ventilation circuit adjustments. They also routinely utilize validated ventilation models to track ventilation system performance and thus effectively plan and budget for major ventilation infrastructure, as the mine expands. The modeling program of choice in Australia is "Ventsim" software which is now available in a fully graphical 3D configuration as well as the widely utilized 2D version, the models of which are operable on the newer format.
机译:在基于风险的逻辑时代,以确保我们的人民的安全性除了最良好的矿山网站,我们根本无法证明缺乏保持良好的通风电路模型。大多数澳大利亚地雷至少在地下煤炭部门维持经过验证的模型,以协助次要的变更管理过程到主要通风电路调整。它们还经常利用验证的通风模型来跟踪通风系统性能,从而有效地计划和预算主要通风基础设施,因为矿井扩张。澳大利亚首选建模程序是“Ventsim”软件,现在以完全图形的3D配置提供,以及广泛使用的2D版本,其型号可在更新格式上操作。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号