On December 16, 2003 the contract for the design, manufacture, installation and commissioning of the turnkey injector system for the Australian Synchrotron Project was awarded to industry. ACCEL Instruments GmbH [1] delivered the turnkey 100MeV linac and the booster RF system. Commissioning of the linac for ASP was performed in December 2005, right after successful commissioning of the Diamond Light Source injection linac [2]. The 500MHz booster cavity and related low level RF system was commissioned after installation of the booster in early 2006. The paper will present design and layout information, as well as commissioning results.