首页> 外文会议>European Particle Accelerator Conference >THE MAGNETS OF THE METROLOGY LIGHT SOURCE IN BERLIN-ADLERSHOF
【24h】

THE MAGNETS OF THE METROLOGY LIGHT SOURCE IN BERLIN-ADLERSHOF

机译:柏林 - adlershof的计量光源的磁铁

获取原文

摘要

The German National Metrology Institute (PTB) in close cooperation with BESSY II (Berlin) are currently carrying out the construction the low-energy "Metrology Light Source" (MLS) (Fig.1) as a synchrotron radiation facility situated in the close vicinity of BESSY II. Constructions of the MLS facility are in progress and nearly finished [1]. The user operation is scheduled to begin of 2008. Dedicated to metrology and technology development in the UV and EUV spectral range the MLS will close the gap that is existent since the shutdown of BESSY I [2]. A 100 MeV microtron delivered by Danfysik A/S in Jyllige (Denmark) will provide the electrons for the MLS. The total circumference of the MLS is 48 m. The MLS has two long and two short straight sections. It is a asymmetric double bend achromat. The electron energy is ramped to the desired value between 200 MeV and 600 MeV. The expected life time for electron energy between 200 MeV and 600 MeV at maximum beam current of 200 mA is between 1 hour and 10 hour, respectively.
机译:与Bessy II(柏林)密切合作的德国国家计量研究所(PTB)目前正在施工低能量“计量光源”(MLS)(图1)作为位于附近的同步辐射设备Bessy II。 MLS设施的结构正在进行中,几乎完成[1]。用户操作计划于2008年初开始。致力于在UV和EUV光谱范围内的计量和技术开发,MLS将关闭自Bessy I [2]的关闭以来存在的差距。在Jyllige(丹麦)中的Danfysik A / S提供的100 MeV Microtron将为MLS提供电子。 MLS的总圆周为48米。 MLS有两种长而两条直线部分。它是一种不对称的双弯曲achromat。电子能量升高到200MeV和600 meV之间的所需值。 200MeV和600 MeV在200mA的最大光束电流之间的预期寿命时间分别为1小时至10小时。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号