首页> 外文会议>IET International Conference on Advances in Power System Control, Operation and Management >ASSESSING THE FEASIBILITY OF THE INTERCONNECTED POWER MARKET IN AUSTRALIA
【24h】

ASSESSING THE FEASIBILITY OF THE INTERCONNECTED POWER MARKET IN AUSTRALIA

机译:评估澳大利亚互联电力市场的可行性

获取原文

摘要

Take into account the unique geographical location of Australia, there is a time difference of two hours between east and west coasts of the country. This means the peak of energy usage in the two regions will occur in two different time periods. This paper studies the feasibility of building a transmission line to connect the energy markets in both east and west Australia. A simplified market simulation model is developed to investigate the operation of the interconnected market. The market prices in different regions with and without the proposed interconnection will be calculated by the proposed simulation model.
机译:考虑到澳大利亚独特的地理位置,在该国东部和西海岸之间存在两小时的时间差。这意味着两个区域中的能量使用峰值将在两个不同的时间段中发生。本文研究了建设传输线以将能源市场连接到东部和西澳大利亚的能源市场的可行性。开发了一种简化的市场仿真模型来调查互联市的运行。通过提出的仿真模型计算不同地区的市场价格和没有所提出的互连。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号