首页> 外文会议>International Congress on the Science and Technology of Ironmaking >BLAST FURNACES CAMPAIGN EXTENSION AND RELINE PLANNING AT CHERMK - SEVERSTAL
【24h】

BLAST FURNACES CAMPAIGN EXTENSION AND RELINE PLANNING AT CHERMK - SEVERSTAL

机译:高炉竞选扩展和Chermk - 韦斯塔尔的Reline规划

获取原文

摘要

Intensive operation of blast furnace allows increase in production of hot metal and profitability of Iron & Steel Works. However, blast furnace life could be sacrificed if no measures are taken to protect refractory lining and to build stable accretion. CherMK and Hatch developed a systematic approach to monitor conditions of BF hearth lining using Acousto Ultrasonic-Echo (AU-E) non-destructive testing developed by Hatch. Multiple testing of blast furnaces revealed problematic areas with accelerated refractory deterioration and minimal thickness, formation of elephant foot, extent of accretion and speed of refractory wear, cracks and other anomalies. Improvement in coke quality, periodical staves washing, the addition of titania, grouting etc. were recommended and implemented to prolong furnace life while maintaining the intensity of furnace operation.
机译:高炉的密集操作允许增加铁和钢厂的热金属和盈利能力。然而,如果没有采取措施保护耐火衬里并构建稳定的增生,则可以牺牲高炉寿命。 Chermk和舱口制定了一种系统的方法,可以使用舱口盖开发的Acousto超声波(AU-E)非破坏性测试监测BF炉膛衬里的条件。高炉的多次测试揭示了具有加速耐火劣化和最小厚度的有问题的区域,形成大象脚,抑制程度和耐火磨损的速度,裂缝和其他异常的速度。建议使用焦炭质量,期刊桩,加入巨头,灌浆等,延长炉寿命,同时保持熔炉运行的强度。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号