首页> 外文会议>Institute of Nuclear Materials Management annual meeting >Description of the Load Out Plan Used for the Highly Enriched Uranium Materials Facility at the Y-12 National Security Complex
【24h】

Description of the Load Out Plan Used for the Highly Enriched Uranium Materials Facility at the Y-12 National Security Complex

机译:用于高度富含铀材料设施在Y-12国家安全综合体中使用的负载计划

获取原文

摘要

The U.S.Department of Energy(DOE)National Nuclear Security Administration's Y-12 National Security Complex(NSC)continues to prepare to move into the new Highly Enriched Uranium Materials Facility(HEUMF).This paper will explain the execution plan for moving Y-12's special nuclear material(SNM)from various locations within the plant to the new HEUMF.It will describe the transportation scenarios and simulation models,primary and secondary re-containerization efforts,and relocation of materials to accomplish this task.Material reduction campaigns that are currently taking place in an attempt to reduce the complexity of this task will also be discussed briefly.The current schedule and cost restrictions will also be touched on to the extent possible.This paper will quantify and expound on the task as possible in an unclassified manner.
机译:能源(DOE)国家核安全管理局的Y-12国家安全综合体(NSC)继续准备进入新的高度丰富的铀材料设施(HEUMF)。这篇论文将解释移动Y-12的执行计划从工厂内的各个地点到新患者的特殊核材料(SNM)将描述运输场景和仿真模型,初级和二级集装箱化努力,以及搬迁材料,以实现此任务。目前的数据减少活动在尝试降低这项任务的复杂性的情况下也将简要介绍。目前的日程和成本限制也将在可能的程度上触及。本文将以未分类的方式量化和阐述任务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号