Description of the Load Out Plan Used for the Highly Enriched Uranium Materials Facility at the Y-12 National Security Complex

机译:Y-12国家安全综合大楼用于高度浓缩铀材料设施的装卸计划说明

获取原文

摘要

The U.S.Department of Energy(DOE)National Nuclear Security Administration's Y-12 National Security Complex(NSC)continues to prepare to move into the new Highly Enriched Uranium Materials Facility(HEUMF).This paper will explain the execution plan for moving Y-12's special nuclear material(SNM)from various locations within the plant to the new HEUMF.It will describe the transportation scenarios and simulation models,primary and secondary re-containerization efforts,and relocation of materials to accomplish this task.Material reduction campaigns that are currently taking place in an attempt to reduce the complexity of this task will also be discussed briefly.The current schedule and cost restrictions will also be touched on to the extent possible.This paper will quantify and expound on the task as possible in an unclassified manner.
机译:美国能源部(DOE)国家核安全局的Y-12国家安全中心(NSC)继续准备移入新的高浓缩铀材料设施(HEUMF)。本文将解释移交Y-12的执行计划。从工厂内各个位置到新的HEUMF的特殊核材料(SNM)。它将描述运输方案和模拟模型,一次和二次重新容器化工作以及完成该任务所需的材料迁移。为了减少任务的复杂性而进行的尝试也将进行简要讨论。还将尽可能地讨论当前的进度和成本限制。本文将以未分类的方式对任务进行量化和阐述。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号