【24h】

The application of two stage indicator kriging in gold vein modeling

机译:两级指示器Kriging在金静脉建模中的应用

获取原文

摘要

Accurate prediction of recoverable reserves is vital to the planning of a mining operation at all stages of its development. Method such as ordinary kriging estimate the mean grade of a block that is fairly large. The usual outcome is that large blocks rarely turn out to be all ore or all waste, thus making reserve estimates an incorrect estimate of what will be mined. Two stage indicator kriging offers a solution to this problem by estimating the distribution of grade values within a large block, rather than just estimating the mean grade of the block. Knowing the distribution of grade value within the block, it is then easy to calculate the proportion of the block that is above cutoff grade and the grade of the ore above cutoff grade. This paper shows that the two stage indicator kriging model is quite applicable and reliable in modeling the gold vein deposit.
机译:准确的可收回储备预测对其开发的所有阶段规划采矿业务至关重要。普通克里格汀等方法估计相当大的块的平均等级。通常的结果是,大块很少是矿石或所有浪费,从而制定储备估计对将开采的估计不正确。通过估计大块内的等级值的分布,两级指示灯Kriging提供了解决这个问题的解决方案,而不是估计块的平均等级。知道块内等级值的分布,然后易于计算截止等级高于截止级的比例和上方截止等级的矿石等级。本文表明,两个阶段指示灯克里格模型在塑造金静脉沉积时非常适用可靠。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号