首页> 外文会议>International Conference on Coastal Engineering 2004 vol.3 >SEDIMENT DYNAMICS ASSOCIATED WITH MANAGED REALIGNMENT; FREISTON SHORE, THE WASH, UK
【24h】

SEDIMENT DYNAMICS ASSOCIATED WITH MANAGED REALIGNMENT; FREISTON SHORE, THE WASH, UK

机译:与管理重新调整相关的沉积动力学;弗鲁斯顿岸,洗车,英国

获取原文

摘要

The managed realignment (MR) undertaken at Freiston Shore has led to scour around the breaches in the embankment, as well as an unforeseen enhancement in the development of a creek system on the mid-intertidal zone. This was related to the MR being at a lower elevation than the adjacent saltmarsh, causing high flows (3 ms~(-1)) into the MR site during high spring tides; this was followed by a gradual release of the water volume throughout low water (0.2-0.5 ms~(-1)). The width of the channels in the breaches increased by 15 m over 2 months. The majority of the sediment made available was deposited inside the MR site, which acted as an importer of sediment. The creek system on the intertidal zone experienced an increase in annual headward retreat, from 16 myr~(-1) in the 10 years before, to 450 myr~(-1) in the 16 months following the MR.
机译:在弗里斯顿岸进行的管理调整(MR)导致堤防的违规行为,以及在中间跨境区的溪流系统的发展中的不可预见的增强。这与MR处于较低的海拔高度,而不是相邻的盐雾,在高弹簧潮汐期间导致高流量(3ms〜(-1))进入MR网站;然后逐渐释放出整个低水量的水体积(0.2-0.5ms〜(-1))。违规通道的宽度超过2个月增加了15米。大多数沉积物沉积在MR遗址内,担任沉积物的进口国。透模区的小溪系统在前10年内从16个Myr〜(-1)中的年度前撤退增加到450 myr〜(-1),以便在MR后的16个月内。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号