首页> 外文会议>International Offshore and Polar Engineering Conference >Design of Monopile Foundations for Large Offshore Windturbines -- Experiences from the First Projects Offshore the British Coast
【24h】

Design of Monopile Foundations for Large Offshore Windturbines -- Experiences from the First Projects Offshore the British Coast

机译:大型离岸Windturbines的纪用基础设计 - 海岸近海近海岸项目的经验

获取原文

摘要

Recent wind farm development has shown a shift towards choosing large windturbine sites well away from habited areas. Offshore sites are becoming increasingly used. The placement of windturbines in harsh offshore environments is an engineering challenge, which requires development of suitable foundation designs as well as dedicated installation methods in order to overcome the access restrictions. This paper describes the development of offshore monopile foundations for the first three major British offshore sites for large wind turbines in the 2 MW class: Blyth (2 foundations), North Hoyle (30 foundations) and Scroby Sands (30 foundations). The paper includes a discussion and evaluation of design and installation of the foundations. Installation tolerances for main components, which are installed separately offshore: pile, transition section, sea access arrangement, J-tubes and access platform are discussed. Seabed scour protection solutions are briefly described.
机译:最近的风电场开发表明,从习惯区域远离休息区的大型Windturbine遗址的转变。近海地点越来越多地使用。 Windturbines在苛刻的海上环境中放置是一种工程挑战,需要开发合适的基础设计以及专用的安装方法,以克服访问限制。本文介绍了2 MW级别的大型风力涡轮机的前三个主要英国近海地点的海上纪用基础的发展:Blyth(2个基金会),北霍伊勒(30个基础)和斯克罗比的沙滩(30个基础)。本文包括讨论和评估基础的设计和安装。讨论了近海上安装的主要组件的安装公差:堆积,过渡部分,海门禁装置,J管和接入平台。简要描述了海底防污解决方案。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号