Service contract management for sanitary sewer cleaning, CCTV, cured-in-place pipe lining, small repairs, manhole rehabilitation, and root removal

机译:卫生下水道清洁服务合同管理,中央电视台,固化管道衬里,小型维修,人孔康复和脱落

获取原文

摘要

The City of Austin Water Utility, starting on the path to compliance with the proposed United States Environmental Protection Agency's Capacity, Management, Operations and Maintenance (CMOM) program and to eliminate Sanitary Sewer Overflows to the greatest extent possible, developed an Enhanced Maintenance Program. The program addresses basins that were not scheduled for a Sewer System Evaluation Survey (SSES), based on the Infiltration/Inflow Analysis studies, through the Austin Clean Water Program. The SSES basins encompass approximately 40%, or 1,062 miles, of the 2,656 miles of sanitary sewers in the Water Utility Service Area. This Enhanced Maintenance Program is targeted at addressing the remaining 60%, or 1,594 miles, of sewers. To supplement existing staff capabilities to identify and rehabilitate sources that could potentially result in dry weather Sanitary Sewer Overflows the Water Utility needed to identify services that could be out-sourced. The service contracts to supplement existing staff programs included sewer cleaning and closed circuit television inspection to perform a system condition assessment. Water Utility staff is performing the manhole inspections to identify additional rehabilitation needs. Service contracts were developed and firms selected to perform cured-in-place pipe lining. Through the service contracts the Water Utility has cleaned and televised 35 miles of sanitary sewer and installed 8.4 miles of cured-inplace pipe liner. Through the Enhanced Maintenance Program the Utility's monthly moving average report on reportable sanitary sewer overflows has documented an approximate 32% reduction. This paper describes the procedures and staff efforts required to manage service contracts for cleaning, CCTV, cured-in-place pipe lining, small repairs, manhole rehabilitation and root removal and hopes to stimulate a discussion with other Collection System and service firm manager's.
机译:奥斯汀市奥斯汀水实用,从遵守拟议的拟议环境保护局的能力,管理,运营和维护(CMOM)计划以及消除卫生下水道,以尽可能最大的维护计划,从而开发出良好的维护计划。根据渗透/流入分析研究,通过奥斯汀清洁水计划,该计划解决了未安排用于下水道系统评估调查(SSES)的盆地。 SSES盆地包括在水公用事业服务区的2,656英里的卫生下水道中约为40%或1,062英里。这种增强的维护计划针对剩余的60%,或1,594英里,下水道。为了补充现有的员工,以识别和恢复可能导致干燥天气卫生下水道的来源,溢出所需的水效用,以确定可以出来的服务。为补充现有员工计划的服务合同包括下水道清洁和闭路电视检查,以进行系统条件评估。水实用员工正在进行Manhole检查,以确定其他康复需求。开发服务合同和选择的公司,以进行固化的管道衬里。通过该服务合同,水实用工具已清洁和电视35英里的卫生下水道,并安装了8.4英里的固化管衬垫。通过增强的维护计划,公用事业的每月移动平均报告关于可报告卫生下水道溢出的报告已记录近似的32%。本文介绍了管理清洁服务合同所需的程序和工作人员努力,中央电视台,固化管道衬里,小型维修,人孔康复和根除并希望刺激与其他收集系统和服务公司经理的讨论。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号