首页> 外文会议>ALTA Nickel/Cobalt Conference >TESTWORK TO SUPPORT RIGOROUS PERMIT REQUIREMENTS FOR POLYMET MINING'S NORTHMET DEPOSIT IN MINNESOTA RECOVERY OF Cu-Ni-Co-Zn-Pd-Pt-Au
【24h】

TESTWORK TO SUPPORT RIGOROUS PERMIT REQUIREMENTS FOR POLYMET MINING'S NORTHMET DEPOSIT IN MINNESOTA RECOVERY OF Cu-Ni-Co-Zn-Pd-Pt-Au

机译:验证,以支持明尼苏达州明尼苏达州的多元矿业矿床矿床储存的严格许可要求Cu-Ni-Co-Zn-PD-PT-AU

获取原文
获取外文期刊封面目录资料

摘要

The NorthMet Project is well advanced. With its Feasibility Study completed September 2006, the Company has proceeded with the next stage of the development program prior to obtaining permits. Bateman will provide process design and URS Corporation of Denver, will provide the Engineering, Procurement and Construction Management (EPCM) services for the project. The engineering manhours are estimated at 375,000 and over 1 million construction manhours. The front end engineering and design (FEED) work commenced in late 2006. The objective is to maintain the momentum for a production start in late 2008/early 2009. The biggest effort has been made in the environmental and permitting area. All of the engineering parameters for both mine and process plant have been designed to meet the highest environmental standards.
机译:Northmet项目进一步得很好。凭借其2006年9月完成的可行性研究,本公司在获得许可证之前介绍了发展方案的下一阶段。 Bateman将为丹佛的流程设计和URS公司提供,将为该项目提供工程,采购和施工管理(EPCM)服务。工程曼丘估计估计为375,000,施工超过100万元。前端工程和设计(Feed)工作于2006年底开始。目的是维持2008年末/ 2009年初生产的生产势头。在环境和允许领域取得了最大的努力。所有矿井和过程工厂的所有工程参数都旨在满足最高的环境标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号