首页> 外文会议>International Conference on Computational Modelling and Experimental Measurements of Free and Moving Boundary Problems >An investigation about preventing cavitation damage and fatigue failure in Derbendikhan power station
【24h】

An investigation about preventing cavitation damage and fatigue failure in Derbendikhan power station

机译:关于防止德比凯山发电站空化损伤和疲劳失效的调查

获取原文

摘要

During periodic inspections of unit 2 in Derbendikhan hydropower station, cavitation damages and fatigue cracks were observed in the runner and draft tubes. Operation data (field data) between 1997-2002 were taken from the station; these data included head and output. The Prototype performance curve was obtained from the model test data and drawn by using the available equations, charts and tables from the literature and catalogs. The results showed that the unit 2 in Derbendikhan hydropower station operated abnormally which led to cavitation damages and fatigue cracks. For simulating the effect of overloading procedure on fatigue cracks in the runner, laboratory measurements were performed using martensitic stainless steel notched specimens. Four modes of overloading procedure are accomplished which were tension (T), compression (C), tension-compression (TC) and compression-tension (CT). For each overloading mode four different load values 150N, 200N, 250N and 300N were applied. The results showed that the beneficial effect (crack retardation) was observed under certain values for each overloading mode.
机译:在德贝尼克水电站的单位2的定期检查期间,在流道和牵引管中观察到浮雕损伤和疲劳裂缝。 1997-2002之间的操作数据(现场数据)从车站获取;这些数据包括头部和输出。原型性能曲线是从模型测试数据获得的,并通过使用文献和目录的可用方程式,图表和表来绘制。结果表明,德比克汉水电站的单元2异常操作,导致空化损伤和疲劳裂缝。为了模拟超载过程对跑步者疲劳裂缝的影响,使用马氏体不锈钢缺口样本进行实验室测量。实现了四种重载过程,其是张力(t),压缩(c),张力 - 压缩(Tc)和压缩张力(CT)。对于每个重载模式,应用四个不同的负载值150n,200n,250n和300n。结果表明,在每个过载模式的某些值下观察到有益效果(裂缝延迟)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号