首页> 外文会议>World of Coal Ash Conference >Groundwater Corrective Action Assessment Using Fate and Transport Modeling
【24h】

Groundwater Corrective Action Assessment Using Fate and Transport Modeling

机译:采用命运和运输建模的地下水纠正措施评估

获取原文

摘要

The CCR Rule (Title 40 Code of Federal Regulations Part 257, Subpart D, Standards for the Disposal of Coal Combustion Residuals in Landfills and Surface Impoundments) stipulates that an assessment of corrective measures must be initiated within 90 days of identifying a constituent listed in Appendix IV at a statistically significant level exceeding the groundwater protection standard (when an alternate source is not identified), or immediately upon detection of a release. The assessment must consider factors including performance, reliability, safety, and time needed for implementation. The results are to be publicly available and discussed in a public meeting. Based on the assessment, the owner/operator must select a remedy that meets objectives including protection of human health and environment, meet groundwater protection standards, and control/eliminate future releases.
机译:CCR规则(第40条联邦法规第257部分守则,船群和表面蓄水中煤炭燃烧残留的股票D标准)规定,必须在确定附录中列出的成员的90天内进行纠正措施的评估IV在统计上显着的水平超过地下水保护标准(当未识别出替代源时),或者在检测到释放时立即。评估必须考虑因素,包括实施所需的性能,可靠性,安全和时间。结果将公开可用并在公开会议上讨论。基于评估,业主/运营商必须选择符合目标保护人类健康和环境的目标的补救措施,符合地下水保护标准,并控制/消除未来发布。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号