首页> 外文会议>World of Coal Ash Conference >Development and Implementation of a Quality Assurance Program for the TVA Kingston Ash Recovery Project
【24h】

Development and Implementation of a Quality Assurance Program for the TVA Kingston Ash Recovery Project

机译:TVA金斯敦灰恢复项目的质量保障计划的开发与实施

获取原文

摘要

On December 22, 2008, a coal fly ash release occurred at the Tennessee Valley Authority’s (TVA’s) Kingston Fossil Plant (KIF), allowing a large amount of fly ash to escape into the adjacent waters of the Emory River. The plant is located in Roane County, Tennessee, near the town of Kingston. Ash produced by the combustion of coal for power generation is stored on site in containment areas including a former dredge cell. KIF generates 10 billion kilowatts of electricity per year-enough to supply electricity to approximately 670,000 homes. There are nine coal-fired generating units in operation at KIF and the plant consumes an average of 14,000 tons (12,698 metric tons) of coal per day.
机译:2008年12月22日,田纳西州谷局(TVA'S)金斯敦化石工厂(KIF)发生了煤粉灰释放,允许大量的粉煤灰逃离埃默里河的邻近水域。该工厂位于田纳西州的Roane County,靠近金斯敦镇。由煤炭燃烧产生的灰烬在包括前疏水细胞的遏制区域的现场存储。 KIF每年产生1000亿千瓦的电力 - 足以提供电力至约670,000所房屋。 KIF的燃煤发电机有9种燃煤产生单位,植物每天使用平均14,000吨(12,698公吨)煤。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号