首页> 外文会议>World of Coal Ash Conference >Geotechnical Considerations in Surface Impoundment Management and Closure
【24h】

Geotechnical Considerations in Surface Impoundment Management and Closure

机译:表面蓄水管理和关闭的岩土考虑

获取原文
获取外文期刊封面目录资料

摘要

The closure of coal combustion residuals(CCRs)surface impoundments(SIs)will be occurring with an increasing frequency over the next two to seven years as the U.S.EPA Effluent Limit Guidelines(ELGs)are included in NPDES discharge permit requirements and exclude the discharge of CCR sluice water.The purpose of this paper is to help SI owners become cognizant of the important geotechnical concerns that need to be addressed during the planning and execution phases of the project to provide a cost-effective and safe closure with effective long-term performance.The geotechnical considerations that will be discussed in this paper will include:(i)deciding whether to close the SI in-place or by removal,(ii)what type of cover system is appropriate under the U.S EPA CCR Rule(CCR Rule),and(iii)equipment-induced localized”liquefaction”.This paper provides practical information and solutions to the awaiting challenges that SI owners will encounter.Smaller SIs may be more effectively closed by removal,including consolidation into other CCR disposal units,provided a”clean closure”can be achieved.Recent assessments have been completed to evaluate the environmental impacts of closing larger SIs in-place compared to closure by removal that indicate fewer environmental impacts through in-place closure.There are many alternate cover systems that can meet the CCR Rule.The important geotechnical considerations include the hydraulic conductivity of the bottom liner or underlying natural geologic conditions,the slope/configuration of the final cover,available materials,and the hydrologic environment.Equipment-induced localized liquefaction is a well-documented condition.Providing methods to consider improving the subgrade will be provided to reduce the localized liquefaction will be provided.
机译:煤炭燃烧残留物(CCRS)表面蓄水(SIS)将在接下来的两到七年内增加频率,因为使用剧出污水限制指南(ELG)包括在NPDES排放许可要求中,并排除排除CCR润滑水。本文的目的是帮助SI业主认识到在项目规划和执行阶段期间需要解决的重要岩土性问题,以提供具有有效的长期绩效的成本效益和安全的关闭。本文将讨论的岩土考虑将包括:(i)决定是否关闭SI或通过删除,(ii)在美国EPA CCR规则(CCR规则)下酌情适用于哪种类型的封面系统(iii)设备诱导的本地化“液化”。本文为等待挑战提供了实用的信息和解决方案,即Si业主将遇到的挑战.Smaller SIS可以通过Remova更有效地关闭L,包括整合到其他CCR处理单位,提供了“清洁闭合”。已经完成了评估,以评估较大的SIS的环境影响与通过去除闭合,表示通过 - Place Closure。这些替代封面系统可以满足CCR规则。重要的岩土考虑因素包括底部衬垫或底层的自然地质条件,最终盖板,可用材料和水文环境的坡度/配置的液压导电性。设备诱导的局部液化是一种记录良好的条件。将提供要考虑改进的路基的方法,以减少将提供局部液化。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号