CO_2 ENHANCED OIL RECOVERY-SUPPLY OPTIONS,TREATMENT FACILITIES AND EFFECT ON EXISTING DOWNSTREAM PROCESSING

机译:CO_2增强了采油供应选项,治疗设施和对现有下游加工的影响

获取原文

摘要

CO_2 Enhanced Oil Recovery(EOR)projects are receiving increased attention with crude oil prices close to 30/Bbl.Oil producers in the United States,the Middle East and Asia are looking at enhanced oil recovery for aging oil fields,or for under-producing areas of otherwise productive oil fields.Some of these projects are considering flue gas recovery as a source of CO_2.This paper reviews the various aspects of a complete CO_2 EOR project including CO_2 capture,compression and transmission,CO_2 injection wells,produced CO_2-rich gas treating options,and corrosion control.Most of the CO_2 EOR projects in the world are using naturally occurring CO_2 resources as the supply of injectant CO_2.Other sources of CO_2 include industrial sources,such as gasification plants and ammonia plants,and recovery from flue gas.Commercial processes for recovery of CO_2 from flue gas use a typical amine solvent configuration to recover CO_2 from coal,oil or gas fired boilers,gas turbines or fired industrial heaters.The cost reported in the literature for CO_2 recovery from flue gas,compression to 2000 Psig,and dehydration varies widely from a low of 1.00 per thousand standard cubic feet(MSCF)to almost 3.00/MSCF.Critical factors that affect this cost are the CO_2 concentration in the flue gas,extent of integration of the facility,number and location of flue gas sources,and the cost of fuel or steam.The flow rate and CO_2 concentration of associated gas from the oil production will change substantially over the life of a CO_2 EOR project.The CO_2 concentration can vary from zero to over 80 volume percent.This has major implications on the downstream processing system.The options for downstream CO_2 recovery are:(1)no recovery,(2)recycle of all associated gas,(3)membrane system,(4)simple fractionation,(5)multi-tower fractionation.The selection of the most appropriate process for a given application depends on the capacity of the existing processing facility,the materials of construction required for the higher CO_2 content,and the value of natural gas and natural gas liquids(NGL's).Corrosion in a CO_2 EOR project is a serious concern due to the presence of CO_2 at high partial pressure under water-wet conditions.A comparison of the relative economics was made for a sample project to increase oil production from 10,000 Bbl/day to 37,000 Bbl/day,using 200 MMSCFD miscible injectant.The total cost of incremental oil production is 29/Bbl for a project with a 400 MM grass roots flue gas CO_2 capture plant and 1.00/MSCF of CO_2 operating cost.Using purchased CO_2 at 1.90/MSCF,and by recovering and re-injecting CO_2,the cost of incremental oil production can be reduced to 25/Bbl.The viability of CO_2 EOR projects is highly influenced by the cost of the CO_2 supply,the distance the CO_2 must be pipelined,the cost of additional oilfield production facilities,and the extent of modification needed for the oil and gas processing facilities,as well as the world price of oil.
机译:CO_2增强的石油恢复(EOR)项目正在接受高于30 / BBL的原油价格上涨的关注。美国的生产商,中东和亚洲正在寻求增强的衰老油田的石油恢复,或为产后生产其他生产石油领域的领域。这些项目正在考虑烟气恢复作为CO_2的来源。这篇论文审查了一个完整的CO_2 EOR项目的各个方面,包括CO_2捕获,压缩和传输,CO_2注射井,生产的CO_2气体处理选项和腐蚀控制。最重要的是世界上的CO_2 EOR项目正在使用自然发生的CO_2资源作为注射CO_2的供应。其他CO_2来源包括工业来源,例如气化植物和氨植物,以及从烟道中恢复Gas.Commercial用于从烟道气中恢复CO_2的方法使用典型的胺溶剂构型来回收煤,油或燃气锅炉,燃气轮机或燃烧工业的CO_2加热器。从烟气压缩到2000psig的Co_2恢复的文献中报告的成本从1.00千立方英尺(MSCF)的低1.00 / MSCF)到近3.00 / MSCF的少量变化。影响这一成本的临时因素烟道气中的CO_2浓度,设施集成的程度,烟道气源的数量和位置,以及燃料或蒸汽的成本。来自石油生产的相关气体的流速和CO_2浓度将大幅改变在生命中CO_2 EOR项目。CO_2浓度可以从零到80多个百分比变化。这对下游加工系统具有重大影响。下游CO_2恢复的选择是:(1)没有恢复,(2)所有相关的回收气体,(3)膜系统,(4)简单分馏,(5)多塔分馏。给定应用的最合适过程的选择取决于现有加工设施的能力,施工需求的材料对于较高的CO_2内容,以及天然气和天然气液体(NGL)的价值。CO_2 EOR项目中的腐蚀性是由于水湿条件下的高部分压力下的CO_2的严重关注。比较采用200mmscfd可混溶注射剂,对样品项目增加了一个样本项目,以将石油产量增加到37,000 bbl /日,增加了增量石油生产的总成本为400毫米草根的项目29 / bbl烟气CO_2捕获工厂和1.00 / MSCF的CO_2运营费用。购买的CO_2在1.90 / MSCF,通过回收和重新注入CO_2,增量油生产的成本可以减少到25 / BBL。CO_2 EOR的可行性项目受到CO_2供应成本的高度影响,CO_2必须流水线,额外的油田生产设施的成本,以及石油和天然气加工设施所需的修改程度,以及世界价格。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号