首页> 外文会议>International Astronautical Congress >SPACE EXPLORATION SYMPOSIUM (A3) Moon Exploration - Poster session (2D):THE SIGNIFICANCE OF OPERATIONS PREPARATION FOR THE SUCCESSFUL MOON EXPLORATION
【24h】

SPACE EXPLORATION SYMPOSIUM (A3) Moon Exploration - Poster session (2D):THE SIGNIFICANCE OF OPERATIONS PREPARATION FOR THE SUCCESSFUL MOON EXPLORATION

机译:太空勘探研讨会(A3)月亮探索 - 海报(2D):运营准备对成功月亮勘探的重要性

获取原文

摘要

Numerous attempts have been made to increase the reliability of spacecrafts, however, they inevitably come with some forms of off-nominal or unexpected situations in many of those operational phases of those spacecrafts. The success of Moon exploration is not only to accomplish things as planned but also to appropriately respond to every off-nominal or contingency situation with the well-thought-through operations preparation as well as its mission concept and analysis. Little attention has been given to the importance of the operations preparation. The Japanese Experiment Module "KIBO" was assembled in space as part of the International Space Station (ISS) in 2008 and 2009. It has been operated by certified flight controllers at Tsukuba, Japan. It was the first attempt toward human space flight operations in the history of Japanese space program. In addition to the fruitful outcomes in science and physiology areas, it also has been utilized as a testbed for the future space exploration. One example of it is a teleportation of KIBO robotic arm by flight controllers in Tsukuba. The teleoperation of the robotic arm has been successfully conducted and it now covers a broad range of services from a large payload handling to a dexterous maintenance. The operational experience through the teleopration is expected to make a large contribution to a next space exploration program. In the planning phase of each teleoperation of KIBO, plans to respond every off-nominal or contingency situation are well taken into consideration in advance besides the nominal operations based on the mission plans. Those plans are then documented by the pre-determined format to reach a consensus among flight control team members. Furthermore, the systematic training program has also been developed for flight controllers to appropriately handle every off-nominal or contingency situation while maintaining a good situational awareness, effective communication, timely priority handling and decision makings. This paper summarizes the importance of operations preparation for the successfully Moon exploration focusing on the following four standpoints while discussing the lessons learned acquired through KIBO real-time operations and apply those to the future Moon exploration. (1) Spacecraft design considering the operability of flight controllers through the KIBO operations experience (2) Reliability and Consistency of system hardware and software including a ground flight control system and operations documents. (3) Efficient flight control using a hi-operability ground flight control system (4) Systematic training program for flight controllers for Moon exploration
机译:然而,许多尝试增加了航天器的可靠性,然而,它们不可避免地具有这些航天器许多操作阶段的某种形式的非名义或意外情况。月球勘探的成功不仅要完成计划的事情,而且还要适当地响应各个非名义或应急情况,并通过思考的经营制定以及其使命概念和分析。一点关注操作准备的重要性。日本实验模块“Kibo”是在2008年和2009年作为国际空间站(ISS)的一部分的空间的空间中,它已由日本筑波的经过认证的飞行控制器经营。这是日本空间计划历史上的人类空间飞行业务的第一次尝试。除了科学和生理学领域的富有成效结果外,它还被用作未来空间探索的试验台。它的一个例子是筑波飞行控制器的Kibo机器人手臂的传送。机器人臂的远程操作已经成功地进行,现在它涵盖了从大型有效载荷处理到灵巧的维护的广泛服务。通过龙观的运营经验预计将对下一个空间探索计划进行大量贡献。在每次Kibo遥远的规划阶段,除了基于任务计划的标称行动之外,还会提前考虑每次非名单或应急情况的计划。然后,这些计划通过预先确定的格式记录,以在飞行控制团队成员之间达成共识。此外,还为飞行控制器制定了系统培训计划,以适当处理每一个非名义或应急情况,同时保持良好的情境意识,有效的沟通,及时的优先处理和决策。本文总结了运营准备对成功月亮勘探的重要性,该探索关注以下四个立场,同时讨论通过基波实时业务获取的经验教训,并将这些探索应用于未来的月亮探索。 (1)宇宙飞船设计考虑飞行控制器通过KIBO运营经验的可操作性(2)系统硬件和软件的可靠性和一致性,包括地面飞行控制系统和操作文件。 (3)使用高可操作性地面飞行控制系统(4)用于月球勘探的飞行控制器系统培训计划的高效飞行控制

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号