首页> 外文会议>International Astronautical Congress >RISK MANAGEMENT IN THE OPERATION OF A SPACE TECHNOLOGY TEST CENTRE - A CASE STUDY ON AITC MALAYSIA
【24h】

RISK MANAGEMENT IN THE OPERATION OF A SPACE TECHNOLOGY TEST CENTRE - A CASE STUDY ON AITC MALAYSIA

机译:空间技术测试中心运营中的风险管理 - 以AITC马来西亚为例

获取原文
获取外文期刊封面目录资料

摘要

In every project, be it a construction project, a civil project or even in a typical procurement project, risks are unavoidable. Managing risks are crucial to ensure the success of a project, and it is the same for the AITC Malaysia. Risk management is defined as the identification, assessment and prioritization of risks and is extremely important and crucial in ensuring that the execution of the project will not create any negative impacts on the overall project cost, schedule and technical performance. The AITC Malaysia was designed and built by local consultants and contractors where else the installation of test equipment was done by the principals of each equipment. The involvement of various parties not only during installation and commissioning of the AITC, but also during operation of the AITC means risks is not only coming from internal parties, but also external. As the installation and commissioning about to come to an end and the operation of AITC will begin soon, it is imperative to identify risks associate with the operation of a test facility. This paper will review both internal and external risks sources that have been identified using risk charting method. Identified risks will then be assessed for their potential severity of impact and probability of occurrence using Composite Risk Index. Finally, this paper outlines the four strategies, which are risk avoidance, risk reduction, risk transfer and risk retention that will be used to treat the identified and assessed risks. The result of this paper will be presented to the top management of ANGKASA to be adopted.
机译:在每个项目中,作为建筑项目,民用项目甚至在典型的采购项目中,风险是不可避免的。管理风险至关重要,以确保项目的成功,对于AITC马来西亚来说是相同的。风险管理被定义为风险的识别,评估和优先级,对确保项目的执行不会对整体项目成本,进度和技术绩效产生任何负面影响至关重要。 AITC Malaysia由当地顾问和承包商设计和建造,其他人的安装设备的安装是由每个设备的主体完成的。各方的参与不仅在AITC的安装和调试期间,也是在AITC的运作过程中,意味着风险不仅来自内部各方,而且是外部的。随着即将到来的安装和调试即将结束,AITC的运营将尽快开始,因此必须识别与测试设施的运行相关联的风险。本文将审查使用风险绘制方法确定的内部和外部风险来源。然后,鉴定的风险将被评估潜在的影响严重程度和使用复合风险指数发生的发生概率。最后,本文概述了避免风险,风险,风险转移和风险保留的四种策略,将用于治疗已识别和评估的风险。本文的结果将呈现给Angkasa的最高管理。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号